D&S engineering of Jia Yi distribution substation Introduction Introduction: Location: No.1, Huanxi St., Pingtung City, Pingtung County CHEM contracts this project based on the turn-key basis, the scope of supply are: Power Transformation Portion:To set up the brand-new transformers and the relative equipment. Main equipment: D.TR: 3∮161/23.9kV~11.95kV 60/30*2MVA 2 sets 161kV GIS:2000A IC50kA 1 set 23kV GIS:2000A/600A 12kA 1 set SSTR:200kVA 2 sets SCADA 1 set Battery & Charger:DC 125V 240AH 1 set Capacitor:11.95kV 3+3MVA 2 sets,23kV 9000kVAR 2 sets BACK ↑TOP