E&S engineering of Hou Li Extra High Voltage substation

E&S engineering of Hou Li Extra High Voltage substation

Introduction:

Location: No. 17-50, Yongxing RD., Houli District, Taichung City

CHEM contracts this project based on the turn-key basis, the scope of supply are:

  • Power Transformation Portion: To set up the brand-new 161kV GIS and the relative equipment.

Main equipment:

  • 161kV GIS: 2000A IC50kA 1set
  • 69kV GIS on the thirdly side of autotransformer
  • 161kV、69kV、25kV XLPE power cable & 600V control cable
  • Battery & Charger: DC 125V 260AH 2sets, DC 125V 75A Charger
  • 5sets, DC 48V 800AH Charger
  • ( 2N+1 ) 1set
  • SSTR: 1000kVA 2Sets
  • Cable tray 1 set
  • SCADA system include RTU、UPS etc